LTE PUCCH 1 資源計算

 

公式:  n_pucch_(1) (ref. 213)

 

假設 DL RB = UL RB = 50, PHICH 資源 1/6

 

Number of CCE depends on CFI。To calculate the CCE resources,

 

1) Cal. no. of REG in a subframe using CFI.

 

2) Cal. no. of REG to be used by PHICH group

 

TDD, the number of PHICH groups may vary between downlink subframes and is given by  m_i * Phich_group(213)

Uplink-downlink
configuration

Subframe number

0

1

2

3

4

5

6

7

8

9

0

2

1

-

-

-

2

1

-

-

-

1

0

1

-

-

1

0

1

-

-

1

2

0

0

-

1

0

0

0

-

1

0

3

1

0

-

-

-

0

0

0

1

1

4

0

0

-

-

0

0

0

0

1

1

5

0

0

-

0

0

0

0

0

1

0

6

1

1

-

-

-

1

1

-

-

1

 

Note: m = 2 for TDD0 SF 0 & 5, as two UL SF could be ACK/NACKed in these two SFs.

 

1  N_Phich_group = 3 REG (HI in PHICH is coded with 3 bits (212 5.3.5), each bit is spreaded to 4 (211 6.9.1); as BPSK in use, 12 RE needed to send 12 bits, i.e. 3 REGs);if Ng = 1/6,  N_Phich_group = 2 (normal CF, non Cfg0, Sf 0)

so, the CCE used by Phich = 6 REG (normal CF, non Cfg0, Sf 0)

 

3) No. of CCE = floor( (Total no. of REG - REG for PHICH - REG for CFI) / 9)

According to 212. 5.3.4.1 CFI = 32bits, QPSK in use; Thus 1 RE carries 2 bits, and 16 RE needed to carry CFIx; As 1 REG = 4 RE, thus CFI needs 4 REG

 

The number of CCE is calculated by following (1 antenna, TDD0 Ng = 1/6, sf = 1),

 

CFI = 1.

2 REG per RB, thus 50 RB = 100 REG, 1 CCE request 9 REG

Thus, DL CCE at most (100 – 6 – 4)/9 = 10

 

CFI = 2,

5 REG per RB, thus 50 RB = 250 REG, 1 CCE request 9 REG

Thus, DL CCE at most (250 – 6 – 4)/9 = 26

 

 

CFI = 3,

8 REG per RB, thus 50 RB = 400 REG; 1 CCE request 9 REG

thus DL CCE at most (400 – 6 – 4)/9 = 43

 

According to the definition

 = {0, 11, 27, 44}

CFI (1, 2, 3) =>  (42, 106, 174)

 

當 Delta_shift_pucch=1, 1RB容納36個PUCCH 1資源; Delta_shift_pucch=2, 18個PUCCH 1; Delta_shift_pucch=3, 12個PUCCH

 

CFI (1, 2, 3) =>  for  (2, 3, 5)

                        =>  for  (3, 6, 10)

                        =>  for  (4, 9, 15)

 

 

注:下行cce資源的計算,是按照subframe 的順序進行,但是Downlink association set index 則如下圖

 

Table 10.1-1: Downlink association set index :  for TDD (36.213)

UL-DL

Configuration

Subframe n

0

1

2

3

4

5

6

7

8

9

0

-

-

6

-

4

-

-

6

-

4

1

-

-

7, 6

4

-

-

-

7, 6

4

-

2

-

-

8, 7, 4, 6

-

-

-

-

8, 7, 4, 6

-

-

3

-

-

7, 6, 11

6, 5

5, 4

-

-

-

-

-

4

-

-

12, 8, 7, 11

6, 5, 4, 7

-

-

-

-

-

-

5

-

-

13, 12, 9, 8, 7, 5, 4, 11, 6

-

-

-

-

-

-

-

6

-

-

7

7

5

-

-

7

7

-

 

所以計算PUCCH 1 資源的時候需要將subframe 對應的n_cce進行調整

 

發表評論
所有評論
還沒有人評論,想成為第一個評論的人麼? 請在上方評論欄輸入並且點擊發布.
相關文章